Development Timeline

Autograph Serviced Apartments

Development Timeline

Every milestone, month by month — from the day Ibraya Developers took over the project to the pour of the ground floor.

  • 0Milestones
  • 0Months of progress
  • 2024–2026Journey
See it rise in 3D
Autograph tower at night, DHA Lahore
Autograph · 3D model Drag to turn

Build in 3D

Watch Autograph rise

Step through the milestones and see the same tower model grow with the work — from the excavated pit to the ground floor.

Drag to turn · Ctrl + scroll to zoom

202420252026

Illustrative model: the tower is drawn at progress stages that follow each milestone, not to survey scale. Gold outline shows the floors still to come.

The journey continues…

2026
Ground Floor

Ground Floor Jacuzzi Wall Pouring

Ground Floor

Ground Floor Beam Pouring

Ground Floor

Ground Floor Swimming Pool Pouring

2025
Ground Floor

Ground Floor Slab Pouring

Ground Floor

Ground Floor Column Pouring

Ground Floor

Ground Floor Vertical Slab Pouring

Basements

B4 Basement Slab Pouring

Basements

Slab Pouring: Pool & Jacuzzi

Basements

B2 Basement Slab Pouring

Basements

Concrete Pouring B3 Slab

Basements

Construction Update

Basements

Construction Update

Basements

Construction Update

Basements

Construction Update

Raft

50% Raft Completion

2024
Raft

Raft Concrete Pouring

Raft

Steel Fixing

Raft

Concrete Bed Prepared for Raft

Excavation

Excavation Work (Aug – Sep 2024)

Excavation

Struts Fixing

Foundation

Underground Wiring Completed

Foundation

Tubewell Work Complete

Foundation

Piling Work Complete

Foundation

Foundation Work

Takeover

Ibraya Developers Takes Over the Project